The Definitive Master Builders Cheshire
For over 20 years, founder-led JNR Construction has executed Cheshire’s most demanding residential, heritage, and structural projects. Federation of Master Builders accredited. The contractor architects refer when compromise is not an option.
20 Years. 400+ Projects. Federation of Master Builders.






Your vision.
Built without compromise.
For over 20 years, JNR Construction has bridged the gap between architectural vision and built reality. From the conservation of Grade II Listed buildings using traditional lime mortars, to the structural precision required for contemporary open-plan living — we deliver exactly what is drawn.
Founder-led. Federation of Master Builders accredited. Dedicated Project Manager and full CDM 2015 compliance on every site, across Cheshire and Greater Manchester.
Managed from concept to handover.
We eliminate the traditional disconnect between design and construction. As your definitive Design-to-Build partner, JNR Construction takes full single-point accountability for your project. From early-stage structural feasibility to final certification, we manage the risk, coordinate the professionals, and deliver with military precision.
-
1
Feasibility and early engagement
We engage before drawings are finalised. Julian Rowlands reviews the project brief, the site constraints, and the structural intent — identifying the risks that appear in construction but originate in design. We provide a realistic cost assessment based on the scope, not a low number designed to win the job. If the project is not viable within your budget, we say so at this stage rather than halfway through a build.
Every project starts with a site visit and a structured pre-construction conversation covering: the structural approach (what steelwork, what groundworks, what temporary works are likely to be required), the regulatory framework (which Approved Documents apply, whether CDM 2015 notifications are required, whether Listed Building Consent or Conservation Area approval is needed), and the programme implications (realistic timescales for both the pre-construction phase and the build itself).
This engagement costs nothing and commits you to nothing. It does give JNR enough information to provide an accurate preliminary cost plan — not a ballpark figure, but a structured document showing where the costs are concentrated and why.
Where an architect is already appointed, we engage directly with their drawing package at this stage, providing a buildability review and raising any technical queries before the design is finalised. This is the most cost-effective point at which to resolve structural ambiguities.
-
2
Pre-construction and compliance
We do not begin construction until every pre-commencement obligation is satisfied. This is not caution for its own sake — it is the only way to protect the programme once the build starts.
Pre-construction work on a typical JNR project covers:
Building Regulations. Full Plans application submitted to the Local Authority Building Control or an Approved Inspector. Structural calculations produced by the appointed structural engineer and incorporated into the submission. We coordinate between the structural engineer, the architect, and the Building Control Officer to resolve any queries before an approval is issued — not after work has started.
Party Wall. Where the proposed works affect a boundary wall or involve excavation near an adjoining owner's property, Party Wall Notices are served under the Party Wall etc. Act 1996. We assess which notices are required, prepare the notice documentation, and appoint a surveyor where the adjoining owner requires one. We do not begin works within the Act's scope without the notices being formally in place.
CDM 2015 Construction Phase Plan. On projects where CDM 2015 applies, the Construction Phase Plan is prepared and in place before the construction phase begins. This is a statutory requirement under Regulation 12(1) of CDM 2015, not a discretionary document.
Planning condition discharge. Pre-commencement planning conditions are formally discharged with the Local Planning Authority before groundworks begin. Conditions typically cover materials, drainage, ecology, and construction management — each requiring a formal submission and written approval.
Asbestos. On properties constructed before 2000, we require confirmation of a refurbishment/demolition asbestos survey before any strip-out works commence, per the Control of Asbestos Regulations 2012.
-
3
The build — on programme
JNR Construction is formally appointed as Principal Contractor under Regulation 5 of CDM 2015 on all qualifying projects. This is not a marketing claim — it is a legal dutyholder appointment, made in writing, before the construction phase begins.
As Principal Contractor, JNR's responsibilities include:
Site management. The site is run to a Construction Phase Plan that sets out the site rules, induction requirements, emergency procedures, and method statements for high-risk activities. Every trade operative on site is inducted. Unauthorised access is prevented. Facilities meeting Schedule 2 of CDM 2015 are in place from day one.
Trade coordination. JNR coordinates all subcontractors and specialist trades — structural steelwork, groundworks, M&E, plastering, joinery, glazing, roofing — to a sequenced programme. Trades are appointed against the specification, not substituted for cheaper alternatives without the client's knowledge.
Variation control. All changes to the agreed scope of works are formally issued in writing by the client or their contract administrator, priced by JNR, agreed in writing, and incorporated into the contract sum before the works proceed. Verbal instruction does not constitute a valid variation.
Progress reporting. Clients receive structured progress updates — what has been completed, what is on programme, what (if anything) is at risk — at agreed intervals throughout the build. You are not left waiting to visit site to find out what is happening.
Quality inspections. Staged quality checks are carried out at key milestones: prior to closing in any structural element, prior to first fix boarding, and prior to second fix. Building Control inspections are co-ordinated and attended by JNR's site manager.
-
4
Handover and aftercare
Practical completion is not the end of JNR's accountability — it is the beginning of the documented record of everything that was built and how it was built.
At practical completion, the handover package includes:
Building Regulations Completion Certificate. Issued by the Local Authority Building Control or Approved Inspector confirming that the works have been inspected and comply with the relevant Parts of the Building Regulations.
CDM Health and Safety File. Required under Regulation 12(5) of CDM 2015 on all qualifying projects. The file documents the as-built structure, the materials used, the services installed, and any information that will be needed for future maintenance or alteration. It is handed to the client at completion and must be passed on with the property on any future sale.
Gas Safe and Part P certification. All gas work certified by a Gas Safe registered engineer. All electrical work certified by a Part P registered operative, with the appropriate Building Regulations notification.
O&M manuals. Operating and maintenance documentation for installed systems — heating, ventilation, mechanical plant — so the client understands how the building works and what routine maintenance is required.
Snagging record. A formal snagging list produced at practical completion, agreed with the client, and resolved within the defects liability period specified in the contract.
The defects liability period (typically 12 months under a JCT Homeowner Contract) runs from practical completion. If defects attributable to JNR's works appear during that period, we return and resolve them. The client has a direct contractual remedy — not a series of phone calls to a company that has moved on.
Recent projects on site.
We don’t just sell concepts; we build reality. Each project below shows the transition from architect’s drawings to high-specification delivery.
Full Renovation
Private Residence, Hale
A total property transformation requiring complex ‘iceberg’ basement underpinning and bespoke oak joinery. JNR managed the entire structural shell through to the luxury turnkey finish, working seamlessly alongside the design team.
Hough Architecture
Heritage Restoration
The Angel Inn, Stockport
A landmark Grade II Listed commercial restoration. We satisfied strict Conservation requirements by utilising traditional lime mortars, bespoke sash window reproductions, and structural steel integration to preserve the 1790s fabric.
Hough Architecture
Bespoke Residential
Kitchen Extension, Macclesfield
A modern, distinct kitchen extension and exterior renovation utilising the existing outdoor space with custom-built bi-fold doors. Integration with existing structures and two large skylights create a feeling of light and space.
PLAN Architect Studio
Trusted by homeowners and professionals.
“I own one of Cheshire’s most prestigious estate agencies and am frequently asked to recommend reliable building companies. I have used JNR Construction for both domestic and commercial work and have first-hand experience of their workmanship and professionalism. The interior oak work has been expertly crafted. I feel fully justified in putting forward JNR Construction.”
Edward Naden — Holmes Naden Independent Estate Agents
Let's discuss your vision.
You don’t need a full set of architectural drawings to speak to us.
Whether you’re at the napkin-sketch stage or ready to build, we’re here to offer expert advice.
Frequently Asked Questions
A:
Yes. We are specialists in heritage conservation. Our team is skilled in traditional methods, including lime mortar pointing, lath and plaster, and bespoke joinery reproduction to satisfy Conservation Officers and match historic detailing.
A:
Absolutely. We position ourselves as the 'Architect’s Partner.' We are experienced in working from technical tender packs, JCT contracts, and collaborating with your design team to ensure the structural and aesthetic integrity of the build is maintained.
A:
Yes. We manage full compliance with the Building Safety Act 2022 and Building Regulations 2010. Whether it’s Part L (Energy) calculations for a new build or Part B (Fire Safety) for a loft conversion, we ensure all certification is in place.
A:
We run fully insured, CDM 2015 compliant sites. To minimise disruption, our uniformed staff maintain clean, strictly controlled environments. Every project is professionally managed to ensure absolute safety and programme certainty.